Following these 4 easy steps have been proven to be highly effective for sealing a multitude of surfaces: asphalt, concrete, sidewalks, parking lots, garages, loading docks, industrial warehouse floors, driveways, ramps and much, much more. Additionally, our sealing services have been proven to enhance the longevity of the surface if adequately treated bi-annually.
Step One
For best results, a minimum of two layers must be applied to the asphalt pavement. Additional layers are acceptable; however, the minimum 2 layer requirement is critical.
Step Two
When applying a seal-coat, the temperature must exceed 50° (fahrenheit) and applied for no less than 24 hours. (To achieve ideal results, do not apply if the local forecast predicts temperatures below 50° [fahrenheit].)
Step Three
Avoid oversaturation and moisture to ensure the sealant sets properly - do not apply if the forecast calls for rain within a 24-hour window of sealant application.
Step Four
After the seal coating application is complete, allow for a full 24 hours of no traffic (pedestrian, vehicle, etc) in order to form the sealant and set correctly.